Welcome to
On Feet Nation
Marion Online
goditac499 Online
civaget Online
ayan Online
Jane Maria Online
Posted by goditac499 on November 19, 2024 at 9:50am 0 Comments 0 Likes
Posted by ayan on November 19, 2024 at 9:49am 0 Comments 0 Likes
Posted by Jane Maria on November 19, 2024 at 9:47am 0 Comments 0 Likes
Multi-channel financing, as soon as possible to solve the urgent need for maintenance of machinery and equipment, highlight the timely focus on the conservation of equipment, priority to protect the national highway, the provincial highway section of the road The configuration of the device. Second, the accumulation of funds, scientific and rational increase in the depreciation of existing machinery and equipment to speed up the renewal of machinery and equipment to make it with the development of road maintenance to adapt. In particular, to speed up the realization of mechanical fixed assets, rental idle machinery has been obsolete machinery and equipment, multi-channel machinery and equipment to solve the situation in the difficult situation.Road Repair Machines
Effectively do the "combination of use, reuse mutual support", and always ensure the effective operation of the machinery and flexible deployment should be combined with road maintenance work line length, point (station) and more extensive construction work, the amount of work is not concentrated, decentralized operation of the actual situation , Adhere to the machinery and equipment to prevent the main, compulsory maintenance, depending on the principle of repair, due to the road, due to time to develop mechanical maintenance plan. According to the mechanical use of the technology should be normal maintenance, the small problems, small problems in the bud. Each supporting mechanical group should have a mechanical maintenance workers, in order to overhaul at any time, find fault diagnosis, maintenance, to ensure that work is not affected, so that machinery is always in good condition. In addition to scientific and rational use, according to the amount of construction and process technology requirements, the rational allocation of mechanical and scientific scheduling, to avoid the small car and a single operation caused by mechanical waste waste phenomenon. In the course of the use of timely failure to repair, to prevent sick work. At the same time, make sure to stop the mechanical stop and maintenance, good maintenance on schedule, thereby reducing the number of maintenance and cost.
wholesale chipping spreader sealing foundation cracks from inside effective protection and sealing machine
Thanks for sharing this impressive article here on our website you will play free online euchre games with your friends by connecting them as multiplayer without spending your pocket money.
Comment
© 2024 Created by PH the vintage. Powered by
You need to be a member of On Feet Nation to add comments!
Join On Feet Nation