Significant flagging and telecom frameworks

Alstom has won an agreement worth €106 million from the National Capital Region Transport Corporation Ltd. (NCRTC) to configuration, supply and introduce the flagging, train control and media transmission framework (Package 24) of the 82.15 km Delhi – Ghaziabad – Meerut Regional Rapid Transit System (RRTS) Corridor. NCRTC is a joint endeavor between the public authority of India and conditions of Delhi, Haryana, Rajasthan and Uttar Pradesh. It is executing RRTS, a first-of-its-sort semi-rapid rail line which will decrease the excursion time among Delhi and Meerut to only an hour, contrasted with the current 90-100 minutes, and with a greatest speed of 160 km/h.

Alstom's extent of work incorporates configuration, supply, establishment, testing and charging of flagging and train control, oversight, stage screen entryways and telecom frameworks for the hall. This line will be the first in Quite a while to embrace the European Train Control System (ETCS) half and half Level 3 flagging framework, which is the center flagging and train control segment of the European Rail Traffic Management System (ERTMS).

read more: solution architect jobs

Views: 12

Comment

You need to be a member of On Feet Nation to add comments!

Join On Feet Nation

© 2024   Created by PH the vintage.   Powered by

Badges  |  Report an Issue  |  Terms of Service