For the construction waste crusher, according to its type, it can be divided into jaw crushing equipment, cone crushing equipment and impact crushing equipment. Among these different types of equipment, the jaw crusher plays its thick The role of shredding, in the process of construction waste treatment, is generally in the primary position, the large pieces of garbage are crushed, processed into particles that can be accepted by subsequent production equipment, and then the subsequent production, from this description can Seeing the important role of the construction waste crusher, without the participation of the machine, it may take more cost to complete the construction waste disposal, but the machine will also have problems when working, common parts Damage, lubricant pollution, etc. will affect the production process. In fact, when it is working, there will be internal problems, which are the same as the damage of the parts. One of them is the deviation of the e-plane and even the body. Friction and collision occur on the side, which is extremely important for the work of the E-type construction waste crusher and even the service life. Lee is the need to promptly resolve, here to tell us about the internal problems, how to solve.
First of all, when this problem occurs, it should be stopped first, and then repaired. The repair process is as follows: Loosen the spring tie rod screw to the appropriate degree, and place a 5t or 10t on the rhyme of the back wall of the body. The hydraulic jack, the top start to the appropriate position, not only to prevent the bracket from falling off, but also to make the back against the toggle plate easy to reset, then use the iron to the top of the bracket, hit the iron of the E-type construction waste crusher with a sledgehammer Brazing, resetting the bracket, after resetting, welding a steel plate at the inner end of the bracket groove on the side of the deviation, generally welding both ends to prevent the bracket from running off, this way of treatment can be restored The working performance of the equipment.
In addition, in the production of E-type construction waste crusher, it is important to repair the equipment failure, but more importantly, during the production, the maintenance operation of all parts of the equipment can reduce the frequency of faults during work and reduce the maintenance cost. At the same time, it can also improve the production efficiency of the equipment.
The article mainly introduces the internal problems of the E-type construction waste crusher, mainly the phenomenon that the E-plate runs off and even causes friction and collision with the side of the body. Then it analyzes the solution of this phenomenon and introduces the maintenance during production. The importance of maintenance, there are a lot of detailed problems, we need to be patient.

Views: 0

Comment

You need to be a member of On Feet Nation to add comments!

Join On Feet Nation

© 2024   Created by PH the vintage.   Powered by

Badges  |  Report an Issue  |  Terms of Service