Welcome to
On Feet Nation
sara James Online
naila Online
umair Online
Shiela Online
smithmorgan Online
Posted by Amy on September 13, 2024 at 1:57pm 0 Comments 0 Likes
Posted by Robert on September 13, 2024 at 1:57pm 0 Comments 0 Likes
Earth driveway preparation starts by taking levels across and along the road. If a road grading machine is not available, this is done by hand. The road is first leveled and the hump at the center removed and flattened. After the road is leveled, wetting and compaction is done to achieve a firm base. The rolling is done three times wet and four times on dry surface. After the base is firm, hardcore is laid by hand packing it before it is compacted.Road Repair Machines
Earth road driveways should have hardcore or strong bases of hardcore to reduce the pot holes. If hardcore is not available, it is replaced by murram or quarry dust. The road should have a cumber running across to drain off water. It is also important to excavate drainage channels on both sides of the road. The murram or quarry dust is laid and leveled. It is then wetted and compacted and made to slope to drain water into the channels excavated.
Andrew Karundu Is A Building Economist Providing Home Based Solutions To Fixing, Repairing, Remodeling, Redesigning Your Homes Using Simple Tried And Tested Methods To Improve Your Lifestyles. This Site Should Provide Adequate Information On Most HOME IMPROVEMENT SOLUTIONS.
exercise roller massage fog seal vs chip seal whirlpool washing machine maintenance
Many of the people are addicted to play free online game must visit here and play freecell games free of cost without any sign up process the objective of the game is to take more hands than your opponent player and have to score more points.
Comment
© 2024 Created by PH the vintage. Powered by
You need to be a member of On Feet Nation to add comments!
Join On Feet Nation