Members

At an employee’s discretion they may check the Supplier’s setup, but any such check will not remove liability from the contracting company. Should the Supplier be given authority to proceed, this will in no way relieve the Supplier of his responsibility to prepare the Works. The supplier will be responsible for determining the location of any underground services (e.g. power cables, pipelines Wholesale Jerseys , telephone cables), in the location of excavation and will ensure that all such services are protected from destruction or displacement during the source of the Work.

Filling will be at the Vendor’s cost except when otherwise approved by the Superior. The Vendor will excavate by any method elected provided that the method will result in project conforming to the requirements herein; will conform to all lawful safety requirements; and will not cause destruction or interference to adjacent construction project, the plant or its normal operation.

Adequate pumping facilities will be provided and operated to maintain excavations in a dry condition adequate for placement of concrete or the installation of other items. The supplier will perform all work necessary to protect the excavation and other works from flooding by rain water, ground water or plant process liquors. Excavations will be accurately finished

Views: 1

Comment

You need to be a member of On Feet Nation to add comments!

Join On Feet Nation

© 2024   Created by PH the vintage.   Powered by

Badges  |  Report an Issue  |  Terms of Service