Application and maintenance of new vertical roller mill

The new vertical roller mill can not meet the demand of material production, in addition to its own performance, depends on the use and maintenance of production mode and the new mill in the process of work, can bring benefits for the production line, there are mainly associated with the performance of the vertical roller mill maintenance and use, the main performance is time of purchase, can choose a good production equipment, and maintenance is to prolong the service life of the machine, and the use of standard methods can reduce the degree of wear of the production, these aspects are very important for the whole production process, here is mainly to introduce the two aspects.

First. vertical roller mill operation
Here mainly refers to the factory in accordance with the new vertical roller mill instructions for standardized operation, in general, any of the types of the vertical roller mill in the factory when there are instructions for use, can be used to help staff better, such as competition stage, the machine parameters required the installation process of adjustment, the the machine can not be operated smoothly, have a great impact, but also the production of machines in the play performance and the influence of longevity factors;

Two. Application and maintenance of new vertical roller mill
1. in accordance with the established process to check whether the equipment, valves and other working conditions, and check all kinds of communication facilities are unblocked;
2. check all kinds of instrument and ancillary facilities are safe and reliable, and the vertical roller mill lubrication points are lubricated;
3. check the filter disk, not allowed to have any debris;
4. select a good start program, pay attention to the switch to the correct position, and then open the air buffer inlet valve, see the pressure gauge value can not exceed the prescribed value;
5. Start the washing pump of vertical roller mill, not fully open the valve on the hot water pipe of the filter, and open the weak filtrate valve into the filter;
6. part of the vacuum pipe open the door, and start the donated oil pump;
7. baking furnace equipment, ready to accept incoming materials;
8. start the belt conveyor, and the discharge screw on the filter;
9. Check the rotation direction of the vertical roller mill filter and the feed box and distributor of the filter;