Welcome to
On Feet Nation
basitkhatr6666 Online
jack Online
Leisa Online
Brenda Online
Tommy Online
goditac499 Online
Khalid Shaikh Online
Robinjack Online
DavidAdamson22 Online
Posted by Lura on September 14, 2024 at 6:38am 0 Comments 0 Likes
Posted by Brenda on September 14, 2024 at 6:33am 0 Comments 0 Likes
The ELIM system uses a series of electrodes placed on top of or underneath the geomembrane liner during liner installation. The electrodes are connected to an instrument panel used to make the electrical measurements. A data acquisition system collects and stores the data. The data is processed using advanced mathematical computer algorithms to calculate and display the positions of the leaks.
Added by Water Surveys on December 14, 2021 at 2:32am — No Comments
© 2024 Created by PH the vintage. Powered by