How Does A Demolition Survey Differ From A Management Survey?

Posted by Liz Seyi on December 1, 2024 at 6:36am 0 Comments

A demolition survey is required prior to any demolition to either all or part of a building. A demolition survey is carried out as a requirement under the Construction (Design and Management) Regulations and as stated in the guidance for Regulation 4 in Control of Asbestos Regulations 2012 (CAR 2012).

This however is one of the first steps for the duty holder to comply with the HSE for Regulation 4 'The Management of Asbestos in Non-Domestic Premises' of the Control of Asbestos…